We fix the moisture first, then insulate, frame and finish with materials that can tolerate a below-grade space.

Basement Finishing & Renovation

Scope of work

Finishing a basement starts with water. Before a single stud goes up, we look at grading, gutters, wall cracks and signs of past flooding, and fix what can be fixed from the outside. Then we build a finished space with materials that tolerate below-grade conditions: rigid foam against the foundation, pressure-treated bottom plates, mold-resistant drywall kept off the slab, and flooring that won't swell.

Basement projects we do include family rooms, home offices, gyms, laundry rooms and storage, plus refreshing previously finished basements that got wet.

Technical drawing: Basement wall sectionRIGID FOAM @ FOUNDATIONSTUD WALL (PT PLATE)MOLD-RESISTANT DRYWALLBELOW-GRADE-RATED FLOORINGGRADEFINISHED BASEMENT1ABASEMENT WALL SECTIONSCALE: NTS · AXE CONTRACTING GROUP

What's included

  • Moisture assessment: grading, leaders, cracks and efflorescence
  • Rigid foam insulation and moisture-tolerant framing
  • Mold-resistant drywall and drop or drywall ceilings
  • Luxury vinyl plank, tile or other below-grade-rated flooring
  • Lighting and outlets by licensed electricians
  • Laundry and wet-bar plumbing by licensed plumbers
  • Closets, storage and stair finishing

Local conditions

Staten Island basements and flood zones

Flood history. Parts of the East and South Shore flooded badly during Hurricane Sandy, and some homes sit in FEMA flood zones where below-grade space has use and construction limits. If your house is in one, we'll check what's allowed before designing anything.

What a basement can legally be. In NYC, turning a cellar or basement into a separate apartment or bedroom involves strict DOB requirements for ceiling height, light, ventilation and egress. We build finished recreational space and will tell you plainly where the legal lines are.

Below-grade materials only. Carpet over a slab and paper-faced drywall on the floor are the two most common mistakes we tear out. We don't install either below grade.

How the job runs

Construction schedule

  1. 01Call & walkthrough

    We visit, measure, and listen. Usually within a few days of your call.

  2. 02Written quote

    Itemized scope and price, typically a day or two after the visit.

  3. 03Paperwork & scheduling

    Permits where required, condo/co-op COIs, materials ordered, dates locked.

  4. 04Build

    One crew lead, licensed trades where required, clean site every day.

  5. 05Walkthrough & sign-off

    We walk the finished job with you and close out the punch list.

Durations are illustrative. Your quote includes a schedule for your job.

FAQ

Basements questions

Can I finish a basement that has had water in it?

Often yes, once the source is addressed: grading, gutters and leaders, crack repair, and sometimes interior drainage. We use materials that tolerate moisture so a minor event doesn't mean a full tear-out.

Can you make my basement a legal apartment?

That's a DOB legalization question with strict requirements, and many basements can't meet them. We focus on finished recreational space and will refer you to an architect or expediter if you want to explore legalization.

Often done together

Related sheets

Where we do basements

Next sheet: yours

Tell us what you're building.

Walkthrough, written quote, clear schedule. Staten Island, Brooklyn and Manhattan.

Call Free estimate