SHEET S-207INTERIOR · ADDITIONS
Home additions on Staten Island
Rear extensions, second-story additions and dormers, built to approved plans and tied cleanly into the existing roof, siding and interior.
Home Additions & Extensions
Scope of work
An addition is new construction attached to an old house, and the hard part is the attachment. Foundations have to meet the existing footings, new framing has to match old floor heights, and the roof, siding and interior finishes have to blend so the addition doesn't look tacked on. We handle the build start to finish: foundation, framing, roofing, siding, windows, MEP rough-ins, insulation and interior finishes.
Additions in NYC need drawings from a licensed architect or engineer, zoning review and DOB approval. If you don't have a designer yet, we can recommend architects who work on Staten Island lots regularly, and we'll price the plans as they develop so the design stays on budget.
What's included
- Pre-design budget input with your architect
- Excavation, footings and foundations
- Framing, sheathing, roof tie-ins and dormers
- Roofing, siding and windows matched to the existing house
- Licensed electrical, plumbing and HVAC extensions
- Insulation to current NYC Energy Code
- Drywall, flooring, trim and paint to match
Local conditions
Adding on in Staten Island zoning
Zoning sets the envelope. Staten Island's residential zoning (and special districts like the Special South Richmond Development District) limits how far back, how high and how big you can build. Your architect confirms what's allowed, and we make sure the build matches the approved plans exactly.
Flood zones. In FEMA flood zones on the East and South Shore, new construction can carry elevation and flood-resistant construction requirements. That affects foundation design and cost, so it belongs in the conversation early.
How the job runs
Construction schedule
-
01Call & walkthrough
We visit, measure, and listen. Usually within a few days of your call.
-
02Written quote
Itemized scope and price, typically a day or two after the visit.
-
03Paperwork & scheduling
Permits where required, condo/co-op COIs, materials ordered, dates locked.
-
04Build
One crew lead, licensed trades where required, clean site every day.
-
05Walkthrough & sign-off
We walk the finished job with you and close out the punch list.
Durations are illustrative. Your quote includes a schedule for your job.
FAQ
Additions questions
Do I need an architect for an addition?
Yes. In NYC, an addition requires plans by a licensed architect or professional engineer and DOB approval. We build to those plans and can recommend designers.
Can you add a second story to my house?
Often, if zoning allows the extra floor area and height and the existing foundation and framing can carry it (your engineer confirms that). It's one of the most efficient ways to add space on a small lot.
Often done together
Related sheets
- S-206 Whole-Home & Gut Renovations
- S-101 Roofing & Roof Replacement
- S-103 Siding Installation & Replacement
- S-202 Kitchen Remodeling