SHEET S-203INTERIOR · BATHROOMS

Bathroom remodeling on Staten Island

Tile showers that are waterproofed behind the tile, tub-to-shower conversions, vanities, ventilation and licensed plumbing.

Bathroom Remodeling

Scope of work

Tile and grout aren't waterproof. A shower stays dry because of what's behind the tile: a sloped mortar bed or pre-sloped tray, a waterproofing membrane that runs up the walls, and properly sealed niches and valve penetrations. That layer is what we spend the most care on, because it's what a bad remodel skips and what rots out a subfloor in five years.

We remodel hall baths, primary baths and powder rooms. That includes tub-to-shower conversions, new vanities and tops, toilets, exhaust fans that actually vent outside, tile floors and walls, glass, lighting and accessories.

Technical drawing: Bathroom elevationWATERPROOF MEMBRANE BEHIND TILEFRAMELESS GLASSMIRROR / MED. CABINETVANITY1ABATHROOM ELEVATIONSCALE: NTS · AXE CONTRACTING GROUP

What's included

  • Demolition to studs and subfloor inspection and repair
  • Shower pans, waterproofing membranes and curbless options
  • Tub-to-shower conversions and new soaking or alcove tubs
  • Wall and floor tile, niches, benches and trim
  • Vanities, tops, mirrors, medicine cabinets and lighting
  • Licensed plumbing for valves, drains and fixtures
  • Exhaust fans ducted to the exterior
  • Accessibility upgrades: grab-bar blocking, low-threshold showers

Local conditions

Bathrooms in older NYC houses and buildings

Out-of-level floors. Older Staten Island and Brooklyn homes have floors that have settled over decades. We level and reinforce the subfloor before tile so large-format tiles don't crack or lip.

Apartment buildings. In condos and co-ops, waterproofing is often a board requirement because a leak lands in your neighbor's ceiling. We document the membrane with photos for the building file.

Aging in place. We add blocking for future grab bars and can build low-threshold showers so the bathroom still works for you twenty years from now.

How the job runs

Construction schedule

  1. 01Call & walkthrough

    We visit, measure, and listen. Usually within a few days of your call.

  2. 02Written quote

    Itemized scope and price, typically a day or two after the visit.

  3. 03Paperwork & scheduling

    Permits where required, condo/co-op COIs, materials ordered, dates locked.

  4. 04Build

    One crew lead, licensed trades where required, clean site every day.

  5. 05Walkthrough & sign-off

    We walk the finished job with you and close out the punch list.

Durations are illustrative. Your quote includes a schedule for your job.

FAQ

Bathrooms questions

How long does a bathroom remodel take?

A typical full hall-bath remodel is about two to three weeks on site once tile, vanity and fixtures are on hand. Small refreshes are faster; layout changes take longer.

Can you convert my tub to a walk-in shower?

Yes. It's one of the most requested bathroom projects. We remove the tub, build a waterproofed shower with a low curb or curbless entry, and tile it out.

Do I need a permit for a bathroom remodel?

Replacing fixtures and finishes in place usually doesn't need a permit. Moving drains and supply lines, or adding a bathroom, generally needs a licensed plumber's filing. We'll tell you which applies.

Often done together

Related sheets

Where we do bathrooms

Next sheet: yours

Tell us what you're building.

Walkthrough, written quote, clear schedule. Staten Island, Brooklyn and Manhattan.

Call Free estimate