SHEET S-104EXTERIOR · EXTERIOR PAINTING
Exterior house painting on Staten Island
Most of an exterior paint job is prep, and we do it all. Scrape, sand, repair, prime, caulk, then two finish coats.
Exterior Painting
Scope of work
Paint fails from the bottom up: moisture behind it, chalky old paint under it, or bare wood that never got primed. We wash, scrape and sand to a sound surface, replace or epoxy-repair rotted trim, spot-prime bare wood, caulk the joints, and then apply two coats of exterior acrylic matched to the surface.
We paint wood clapboard and shingles, trim and fascia, stucco, brick and block (with masonry primer), porch floors and railings, and metal railings and gates. We also handle the small carpentry along the way, like a soft windowsill or a split porch post, so you don't need a second contractor.
What's included
- Pressure or hand washing, then a dry-out window before painting
- Scraping, sanding and feathering edges of failed paint
- Rotted trim replacement or epoxy repair
- Spot-priming bare wood and stain-blocking where needed
- Caulking at trim joints, windows and doors
- Two finish coats on siding, trim, doors, shutters and railings
- Masonry and stucco coatings, plus rust conversion on metal railings
- Plants, walkways and windows protected; daily cleanup
Local conditions
Painting houses near the water
Salt and sun. Homes on the East and South Shore take salt air, wind and long afternoon sun. That's harder on paint than an inland block. We use high-quality 100% acrylic exterior finishes and favor satin on trim, which sheds dirt and holds color better than flat.
Lead in older paint. Houses built before 1978 may have lead-based paint on trim and porches. Disturbing it is regulated under EPA renovation rules and safe work practices. Ask us how we handle containment and cleanup on your house before work starts.
Season. Exterior acrylics need surface and air temperatures roughly above 50°F (some products go lower), so Staten Island's painting season runs about April through October. Book spring jobs early.
How the job runs
Construction schedule
-
01Call & walkthrough
We visit, measure, and listen. Usually within a few days of your call.
-
02Written quote
Itemized scope and price, typically a day or two after the visit.
-
03Paperwork & scheduling
Permits where required, condo/co-op COIs, materials ordered, dates locked.
-
04Build
One crew lead, licensed trades where required, clean site every day.
-
05Walkthrough & sign-off
We walk the finished job with you and close out the punch list.
Durations are illustrative. Your quote includes a schedule for your job.
FAQ
Exterior painting questions
How often should a Staten Island house be painted?
Typically every 7–10 years for siding and every 5–7 for trim and porches, sooner near the water or on south- and west-facing walls. Peeling, chalking and caulk gaps are the signs it's time.
Do you paint brick and stucco?
Yes, with masonry-specific primers and breathable finishes. Previously unpainted brick is a big decision because it's hard to undo, so we'll talk through the options, including just cleaning and re-pointing.
Can you match my existing color?
Yes. We can color-match a chip from your house or work from a manufacturer's palette. We'll brush out samples on the wall so you can see them in daylight.
Often done together
Related sheets
- S-103 Siding Installation & Replacement
- S-201 Interior Painting
- S-106 Decks & Porches
- S-105 Pavers, Patios, Driveways & Masonry